BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//TU/e ME//Events//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/Amsterdam
BEGIN:STANDARD
DTSTART:19701025T030000
RRULE:FREQ=YEARLY;BYMONTH=10;BYDAY=-1SU
TZOFFSETFROM:+0200
TZOFFSETTO:+0100
TZNAME:CET
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:19700329T020000
RRULE:FREQ=YEARLY;BYMONTH=3;BYDAY=-1SU
TZOFFSETFROM:+0100
TZOFFSETTO:+0200
TZNAME:CEST
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
UID:event-98@tuemeche.nl
DTSTAMP:20261123T103139Z
DTSTART;TZID=Europe/Amsterdam:20270217T133000
DTEND;TZID=Europe/Amsterdam:20270217T150000
SUMMARY:Electric Airport Co-Design and Operations
DESCRIPTION:Speaker: Finn Vehlhaber\nHost: Mauro Salazar\n\nIn an effort 
 to reduce the carbon emissions of aviation and its reliance on fossil fue
 ls\, manufacturers and start-ups around the world are looking into altern
 ative propulsion technologies\, and first initial electrically powered ai
 rcraft are already being certified. As electric aviation progresses towar
 ds maturity\, airport and aircraft operators must prepare charging infras
 tructure to enable electric flight networks. Lessons learned from the int
 roduction of electric vehicles show that limited availability of charging
  infrastructure presents a major bottleneck in the early stages of adopti
 on. Furthermore\, the electrification of heavy-duty vehicles such as buse
 s and trucks showed that adaptations in the operation may be required to 
 optimally integrate these new vehicles. The installation of charging infr
 astructure may be a major challenge\; even small aircraft for regional us
 e cases will require charging powers that can overwhelm many regional air
 ports and necessitate energy system upgrades. These upgrades range from p
 lacing charging stations on the apron to major grid connection upgrades o
 nce the technology reaches a certain level of maturity. At the same time\
 , airports can and are making use of their vast premises to install solar
  panels and stationary batteries\, which currently helps reduce their ele
 ctricity costs\, but may also provide valuable energy provision capabilit
 ies for aircraft charging in the future.\nThis thesis presents methodolog
 ies for optimizing the installation process of charging infrastructure an
 d future electric aircraft flight operations in the wake of the ongoing e
 nergy transition. First\, we present a framework for how to best incorpor
 ate initial electric aircraft purchases into existing flight schedules th
 at would then be operated by a mixed fleet. We address the fact that the 
 energy consumption of electric aircraft is governed by weather conditions
 \, routing\, and other factors and as such can be subject to some uncerta
 inty that is often hard to quantify. Therefore\, we propose a distributio
 nally robust approach to the fleet assignment problem\, where a Wasserste
 in ambiguity set around samples from previous flights or simulations is u
 sed to inform decisions on which flights to assign to the electric aircra
 ft in the fleet. As a first insight\, we show that these flight assignmen
 ts with their resulting fuel savings and the existence of charging infras
 tructure are closely connected\, and that the amount of electric aircraft
  in the fleet and electrified airports in the network impose bottlenecks 
 on each other in terms of fuel-saving potential. Furthermore\, the choice
  for the radius of the ambiguity set has a profound impact on which route
 s the electric aircraft are employed on and which flight sequences are po
 ssible: We find that schedules can be made robust against out-of-sample r
 ealizations of the flight energy consumption without significant compromi
 se in fuel savings when compared to more optimistic flight assignments.\n
 Next\, we show how daily adjustments to an electric flight schedule can h
 elp reduce airport grid energy requirements by making use of their local 
 renewable energy resources. Results show that shifting flights into favor
 able times can achieve complete grid independence in some cases\, which m
 ay be interesting for very remote airfields. But even small departure tim
 e readjustments and flight reassignments can improve the energy managemen
 t: An online implementation of the framework reveals that a flexible airc
 raft routing that adapts to changes in energy conditions can reduce or sh
 ift grid energy requirements. Finally\, we investigate the potential of v
 ehicle-to-grid in airport parking lots to aid in charging larger electric
  aircraft. We efficiently model the charging dynamics of a large vehicle 
 fleet with partial differential equations and compute the optimal energy 
 management for a scenario where most intra-European flights of one airlin
 e are electrified. The results show that airports could use the energy bu
 ffering capabilities of the vehicles parked on their premises to enable f
 ast turnaround times for the aircraft by supplying high charging powers w
 ithout straining their grid connection or compromising customer vehicle r
 eadiness. We also highlight the cost-saving potential of this approach\, 
 both by shifting grid energy demand in time locally through the energy bu
 ffer\, but also spatially by charging at airports that are located in dif
 ferent electricity markets.\n\nMore info: https://www.tue.nl/en/research/
 researchers/finn-vehlhaber
LOCATION:Atlas 0.710